“Energoremont-Kozloduy” EOOD performs construction-and-erection works at project sites with the following subjects of activity:
• “Reconstruction of the ‘Deactivation’ work station at the contamination workshop unit (CWU) at “NPP Kozloduy” EAD”
• Reconstruction of the 5,6 UL drainage system at “NPP Kozloduy” EAD
• Repair of auxiliary and service structures and platforms of 6th Power Unit’s casing at “NPP Kozloduy” EAD
• Design and construction of a depot for dry storage of exhausted nuclear fuel at “NPP Kozloduy” EAD
• Major overhaul with replacement of the sand fractions of VB 78,79 N01 mechanical filters at a filter hall of splash cooling basins at “NPP Kozloduy” EAD
• Participation in the major overhaul of power units 5 and 6, “NPP Kozloduy” EAD
• Repair of pumps at the Coastal Pumping Station, “NPP Kozloduy” EAD
• Repair and replacement of pipelines
• Repair, mounting, and replacement of fittings & fixtures
• Extraction and processing of the hardened medium in the cube residue containers (CRC) at “NPP Kozloduy” EAD
• Replacement of the feeder scheme of “ХОВ” waters to the ХН 71, 72 electrolysis units and of the existing air conditioning system for their hall by water from the OUX31H01 and OUW33D01 systems
• Repair and reconstruction of buildings and areas in the Open Distribution Outfit, the ОDO Building and Protection Cell parts
• Repair works on the lower support blocks of “РО” of Power Units 5 and 6
• construction-and-erection works, and repair, construction & erection works at sites for major overhaul of installations at “Lukoil Neftochim Bourgas” JSC
• Rehabilitation of heating surfaces and the slag separation system at TPP “Maritza East 2”
• Construction of an FGD plant at TPP “Maritza East 2”
• Construction of the heating and ventilation part for pump house 1 and pump house 2 to section 3, for units 5 and 6 of TPP “Maritza East 2” EAD
• Erection of a turbine and pipelines at “Svilotzel” EAD
• Performance of a typical major overhaul of turbine generator No. 5 and non-destructive testing of components of it at “Heat-and-Power Supply Rousse” EAD
• “Construction of a Complete Installation for Gypsum Calcination on the Territory of “Gypsum” JSC, Koshava village, Vidin area”
• Preparation of metal structures for the “Construction of a Complete Installation for Gypsum Calcination on the Territory of “Gypsum” JSC, Koshava village, Vidin area” site
“Energoremont-Kozloduy” ЕООD performs construction-and-erection works also on the territory of TPP “Republika”-Pernik, TPP “Varna”, TPP “Maritza East 1”, “Enel Maritza East 3”, “Heat-and-Power Supply Rousse”, etc.
• “Reconstruction of the ‘Deactivation’ work station at the contamination workshop unit (CWU) at “NPP Kozloduy” EAD”
• Reconstruction of the 5,6 UL drainage system at “NPP Kozloduy” EAD
• Repair of auxiliary and service structures and platforms of 6th Power Unit’s casing at “NPP Kozloduy” EAD
• Design and construction of a depot for dry storage of exhausted nuclear fuel at “NPP Kozloduy” EAD
• Major overhaul with replacement of the sand fractions of VB 78,79 N01 mechanical filters at a filter hall of splash cooling basins at “NPP Kozloduy” EAD
• Participation in the major overhaul of power units 5 and 6, “NPP Kozloduy” EAD
• Repair of pumps at the Coastal Pumping Station, “NPP Kozloduy” EAD
• Repair and replacement of pipelines
• Repair, mounting, and replacement of fittings & fixtures
• Extraction and processing of the hardened medium in the cube residue containers (CRC) at “NPP Kozloduy” EAD
• Replacement of the feeder scheme of “ХОВ” waters to the ХН 71, 72 electrolysis units and of the existing air conditioning system for their hall by water from the OUX31H01 and OUW33D01 systems
• Repair and reconstruction of buildings and areas in the Open Distribution Outfit, the ОDO Building and Protection Cell parts
• Repair works on the lower support blocks of “РО” of Power Units 5 and 6
• construction-and-erection works, and repair, construction & erection works at sites for major overhaul of installations at “Lukoil Neftochim Bourgas” JSC
• Rehabilitation of heating surfaces and the slag separation system at TPP “Maritza East 2”
• Construction of an FGD plant at TPP “Maritza East 2”
• Construction of the heating and ventilation part for pump house 1 and pump house 2 to section 3, for units 5 and 6 of TPP “Maritza East 2” EAD
• Erection of a turbine and pipelines at “Svilotzel” EAD
• Performance of a typical major overhaul of turbine generator No. 5 and non-destructive testing of components of it at “Heat-and-Power Supply Rousse” EAD
• “Construction of a Complete Installation for Gypsum Calcination on the Territory of “Gypsum” JSC, Koshava village, Vidin area”
• Preparation of metal structures for the “Construction of a Complete Installation for Gypsum Calcination on the Territory of “Gypsum” JSC, Koshava village, Vidin area” site
“Energoremont-Kozloduy” ЕООD performs construction-and-erection works also on the territory of TPP “Republika”-Pernik, TPP “Varna”, TPP “Maritza East 1”, “Enel Maritza East 3”, “Heat-and-Power Supply Rousse”, etc.